Adeos Case Studies

Real results from
real engineering teams.

See how industrial and manufacturing leaders automate document extraction and drawings checks with Adeos.

BOM Extraction from Drawing and Spec Documents to Zoho ERP (Control Relay Panels)
Manufacturing•12 weeks

BOM Extraction from Drawing and Spec Documents to Zoho ERP (Control Relay Panels)

Per-job turnaround targeted to drop from 3-4 days to under 3 hours, monthly capacity to scale from 12-20 to 75-80 panels, and duplicate item-master entries eliminated through automated de-duplication against Zoho ERP

<3 hrs
Turnaround per Job
Engineering Document Intelligence for Aerospace Quality & Inspection
Aerospace•4 weeks

Engineering Document Intelligence for Aerospace Quality & Inspection

Aerospace part inspection report generation streamlined to <15 min by extracting engineering requirements and quality specifications.

15–20 mins
Drawing processing
Auto Ballooning for Engineering Drawings (First Article Inspection)
Aerospace•2-3 weeks

Auto Ballooning for Engineering Drawings (First Article Inspection)

Annotation time cut from 2-4 hours to under 5 minutes per sheet, with AS9102 and PPAP-compliant inspection reports generated automatically

~3 mins
Annotation Time
BOM Extraction from Marine Maintenance Manuals for MDM team (handling 700-vessel fleet)
Marine•10-12 weeks

BOM Extraction from Marine Maintenance Manuals for MDM team (handling 700-vessel fleet)

Procurement lead time faster by 36x, BOM review accuracy improved to 94%, and 36,000+ manual entry hours eliminated annually across a 700-vessel fleet

48–60 hrs
Vessel Processing Time
Automated Comparison of Customer Drawings and Recreated CAD Files
Manufacturing•8-12 weeks

Automated Comparison of Customer Drawings and Recreated CAD Files

Verification turnaround time reduced from 3 hours to 15 minutes, missing dimension detection improved to 93%, and manual review reduced to flagged discrepancies for quality engineers

15 mins
Drawing Verification Time
Scaling PFMEA Review Across an Automotive Supply Chain
Automotive•3-4 weeks

Scaling PFMEA Review Across an Automotive Supply Chain

PFMEA review time cut down to <15 min by automated comparison to the past quality issues and process failure modes from the knowledge bank.

10–15 mins
PFMEA Review Time
Filtered Dimension Extraction for Lift Manufacturing
Manufacturing•8-12 weeks

Filtered Dimension Extraction for Lift Manufacturing

80–90% reduction in manual effort per drawing, processing capacity scaled to 200 drawings per day, consistent two-sheet Excel output for every extraction

~5 mins
Manual Effort
Dimension Extraction and Welding Calculations for Power Boiler Manufacturing
Manufacturing•4-6 weeks

Dimension Extraction and Welding Calculations for Power Boiler Manufacturing

One extraction workflow distributed to 3 departments, reducing per-drawing review from days to hours across a 50–100 drawing project cycle.

1×
Review Duplication

Ready to write your
success story?

Let us show you how Adeos can transform your document and drawing processing workflows.

Contact Sales